High quality and timely completion of work ensure further effective cooperation.
- S.N.Konovalov, Deputy Head of Field Development Department, Gazprom Dobycha Yamburg Ltd.: “Construction control, as engineering supervision of “YUZHNIIGIPROGAZ” at commissioned facilities, was carried out on continuous basis with efficient solution of all problems."
- P.V.Gladkov, Chief Engineer–First Deputy Director General, Gazprom Dobycha Astrakhan Ltd.:"The Institute efficiently arrived at optimal solutions to various problems related to ensuring the regional development and efficient operation of designed facilities. For the period of collaboration with OJSC “YUZHNIIGIPROGAZ” there were no complaints on the part of Gazprom Dobycha Astrakhan Ltd. about soundness of engineering solutions and quality of produced documentation."
- S.À.Mikhailenko, Chief-Engineer-Deputy Director General, Gazprom Dobycha Orenburg Ltd.: OJSC “YUZHNIIGIPROGAZ” has been carrying out design and survey works for construction of Îrenburg Gas and Chemical Complex over a long period of time (since 1967). The works are performed based on PC of the latest generation applying advanced software that ensures automation and adequate quality of produced design documentation, carrying out engineering design, processing of survey data, elimination of environmental problems."
- Î.N.Sergeyev, Deputy Director General for Design Works and Production Preparation, CJSC ”Yamalgazinvest”: "The technological processes implied by the engineering solutions ensure safe operation of facilities: ÎJSC "YUZHNIIGIPROGAZ" meets the highest quality standards and schedule times set by the customer. Cooperation with the Institute guarantees successful implementation of investment projects."
- I.P.Ênyaz, Deputy Director General - Head of Capital Construction & Repairs Board (UKSiR), Gazprom Transgaz Yugorsk Ltd.: "Since 1967 OJSC "YUZHNIIGIPRPGAZ" has been designing comprehensive project design documentation for construction of main gas pipelines, development of the Tyumen region gas fields, utility systems supplying gas to settlements and industrial facilities, as well as engineering-geodetic works. On the part of Gazprom Transgaz Yugorsk Ltd there were no complaints about soundness of engineering solutions, appropriateness of accepted engineering solutions."
- À.I.Startsev, Head of Capital Construction Board, Gazprom Dobycha Nadym Ltd.: "I would like to kindly request you to announce gratitude to the supervision team of your company for the efficient participation in construction and initiative taken at commissioning of the "Booster Compressor Station (2d line) at Yamsoveysky Gas Condensate Field."
- À.À.Ìàtviyevsky, Chief Engineer, NOVATEK-Òàrkosaleneftegaz Ltd.: "We would like to express our gratitude to the Institute’s employees for the advanced engineering solutions taken at development of electrotechnical part of detail design documentation for the project: "Development of Khancheysky Gas Condensate Field. Booster Compressor Station", as well as for the proficient field supervision on construction site of the Booster Compressor Station facilities."